Water Infrastructure Upgraded

I managed to get the rest of the trench dug, 130′ of pipe and wire, a manual valve, a solenoid valve, and 2 hose bibs installed.  I did a pressure test and found no leaks.  Only thing I have to finish is putting back the dirt.  I’ve got a lot of rocks that I want to sort out so it will take me an hour or so to get that done.