Tag Archives: PVC

Water Infrastructure Upgraded

I managed to get the rest of the trench dug, 130′ of pipe and wire, a manual valve, a solenoid valve, and 2 hose bibs installed.  I did a pressure test and found no leaks.  Only thing I have to … Continue reading

Posted in Gardening, Projects | Tagged , , , | 1 Comment