After months of delays due to rain, and then delays caused by the delays, I finally have the foundation for the new shop poured.
These are the templates I made for the anchor bolts
70+ cubic yards of select fill moved in to make a pad
17 piers drilled (18″ diameter, 12′ deep)
Trenched for the beams, pipe, and conduit (exterior beams: 30″, interior beams: 24″)
Cleaned out trenches, installed plumbing pipes
Installed electrical conduit to house (with several extras), Rebar in beams and slab:
City inspection, almost ready:
Had crew of 10 here for the pour. It took 82 cubic yards. We found a problem with the exterior pier placement, so we postponed the pouring of those:
Finally!