I managed to get the rest of the trench dug, 130′ of pipe and wire, a manual valve, a solenoid valve, and 2 hose bibs installed. I did a pressure test and found no leaks. Only thing I have to finish is putting back the dirt. I’ve got a lot of rocks that I want to sort out so it will take me an hour or so to get that done.
Subscribe to Blog via Email
Recent Comments
- Tw on DIY Automatic Transfer Switch
- Arby Arbutina on Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Algorithm Is The New Rhetoric - Victory Girls Blog on The Legacy of Andrew Breitbart
- Ian on Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Ray Cook on Private RoIP (Radio over IP) System
Top Posts
- Private RoIP (Radio over IP) System
- Time Average in Ladder Logic (ControlLogix AOI)
- Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Wiring Schematic for Bad Boy ZTE Mower
- W123 / 300D EGR, ARV, and ALDA systems
- Dasher's Warble Fly
- Getting Ambient Weather Data into Ignition
- The Story of the Bronze Rat
- Homemade Mouse Trap
- Troy Bilt Chipper Shredder Review
Resume
Bookmarks
Archives
Categories
-
Recent Posts
Meta
Damn your ambiscious……….