I managed to get the rest of the trench dug, 130′ of pipe and wire, a manual valve, a solenoid valve, and 2 hose bibs installed. I did a pressure test and found no leaks. Only thing I have to finish is putting back the dirt. I’ve got a lot of rocks that I want to sort out so it will take me an hour or so to get that done.
Subscribe to Blog via Email
Recent Comments
- Elaine on Undocumented Secrets of Integrating BACnet MSTP
- Kent Hervey on Interior trailer lights
- Hector Flores on Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Bill Roberge on Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Brian Gallimore on Wiring Schematic for Bad Boy ZTE Mower
Top Posts
- Quadrasteer / Dana 60 Axle Differences and Similarities
- Quadrasteer / Dana 60 Rebuild How-To (ring, pinion, carrier replacement)
- Wiring Schematic for Bad Boy ZTE Mower
- Blue Indigo Snake
- Review of the YHS-302A Process Calibrator Meter With Multimeter
- WHERE DID THE WHITE MAN GO WRONG?
- use ssh without a password
- Private RoIP (Radio over IP) System
- Goodbye to Conservatism
- Changefest 09
Resume
Bookmarks
Archives
Categories
-
Recent Posts
Meta


Damn your ambiscious……….