blog.briangallimore.com
Water Infrastructure Upgraded
I managed to get the rest of the trench dug, 130′ of pipe and wire, a manual valve, a solenoid valve, and 2 hose bibs installed. I did a pressure test and found no leaks. Only thing I have …