Entry for August 20, 2006 – More prep work for the patio pave stones

It has been a work-filled weekend for my brother and me.  We finished the digging, emptied 2 more yards of gravel into the patio area, re-routed the last downspout, tied the downspout into the drain, pulled up some underground wiring that was in the way, re-routed a sprinkler head, extended the drain trench, and picked up and unloaded a pallet of pavers.  All of this was in the 100 degree heat.  I don’t know how anyone can do this for a living!

I have a half-pallet of pavers to pick up tomorrow, then I can start laying them down after I get everything level and packed down.  Maybe I can get done next weekend.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>