Entry for August 20, 2006 – More prep work for the patio pave stones

It has been a work-filled weekend for my brother and me.  We finished the digging, emptied 2 more yards of gravel into the patio area, re-routed the last downspout, tied the downspout into the drain, pulled up some underground wiring that was in the way, re-routed a sprinkler head, extended the drain trench, and picked up and unloaded a pallet of pavers.  All of this was in the 100 degree heat.  I don’t know how anyone can do this for a living!

I have a half-pallet of pavers to pick up tomorrow, then I can start laying them down after I get everything level and packed down.  Maybe I can get done next weekend.